  List of High Voltage Alternators Repaired / Rewound / Upgraded By Us
 
Sl.No. Customer Scope of work Guarantee Executed    on
29 TNEB Repairing of stator winding of   35 MW, RADE KONCAR (Yugoslavia make) 11 KV, 750 RPM  - Unit - I - Sholayar Power House - 1. 12 Months 2007
30 KSEB Repair and reinsulation of rotor pole coil to class `H' insulation of   of 130 MW, 11 KV, 375 RPM, Canadian General Electric (Canada) make  - Idukki Power House. 12 Months 2007
31 DS Repair, reinsulation and replacing of stator winding of   15 MW, CKD (Czechoslovakia) make, 11 KV, 1500 RPM - Polur. - 2007
32 SIL Complete rewinding the stator with new coil to class `F' and partial class `H', restacking the stator core of   14375 KVA (11.5 MW), VA TECH HYDRO (India) make, 6.6 KV, 1500 RPM   - Tuticorin. 36 Months 2007
33 TTPL Complete rewinding the stator and rotor with new winding to class `F' level insulation of   1 MW, Leroy Somer (France) make, 11 KV, 1500 RPM  - Trivandrum. 12 Months 2007
34 DS Replacing the   damage stampings with new one revarnishing the remaining stampings and restacking,   fabricating the new class `F' and partial class `H' transposed monolithic moulded stator bars 156 Nos., installing, reinsulation of rotor to class `H' insulation and dynamic balancing the rotor 1500 RPM + 10% over speed and conducting the rotor test at over speed condition and commissioning of   15 MW, CKD (Czechoslovakia) make, 11 KV, 1500 RPM  - Polur. 60 Months 2007
35 LSC Complete rewinding the stator with new coil to class `F' and partial class `H', insulation, repairing the stator core of   2800 KVA , Leroy Somer (France) make, 11 KV, 1500 RPM   - France. 12 Months 2007
36 KSEB Repair, reinsulating the stator coils to class `F' of   16 MW, BHEL (India) make, 11 KV, 600 RPM  - Poringalkuth. 12 Months 2007
37 TNEB Manufacturing and installation of 126 Nos. new stator coils with class `F' insulation, Removing and revarnishing of 20 ton stator stampings and revarnish with conveyor oven, testing, aligning and commissioning of   7.81 MW, Metropolitan vickers (England) make, 11 KV, 600 RPM  - Unit II - Singara Power House - Tamilnadu Electricity Board. 36 Months 2007
38 TCL Repair and applying of corona production material for reducing the corona discharge in stator winding of   6450 KVA, Leroysomer (France) make, 11 KV, 1500 RPM  - Ranipet. 6 Months 2007
39 JSW Unloading the 126 tons machine at our works using our overhead creane, manufacturing and installation of 620 Nos. new rotor coils with class `F' insulation re conditioning the commutator and shaft bearing zonals, fabrication of 4 Nos. main pole brick, 9 Nos. main pole coils, 20 Nos. inter pole coils & 20 Nos. Compensation coils, re insulation of 11 Nos. main field coils to class `F' and partial class `H' insulation, dynamic balancing the 55 tones rotor, testing, aligning and commissioning of 3.5 MW , 1000 V, 70 RPM DC machines - Mettur. 24 Months 2008
40 JSW Manufacturing and installation of 620 Nos. new rotor coils with class `F' insulation, making new commutator, dynamic balancing the 55 tones rotor, testing, aligning and commissioning of 3.5 MW , 1000 V, 70 RPM DC machines - Mettur. 24 Months 2008
41 Adyard Manufacture and exporting of 74 Nos Class F insulation new stator coils for 10.4 MW Alstom make 11 KV, 1490 RPM – Abudhabi. 12 Months 2008
42 SPML Complete rewinding the stator with class F and partial class H insulated new 72 coils, rewinding the rotor with H conductor and insulation of 6 MW Leroy somer (France) make 11 KW 1500 RPM - Cheranmahadevi. 12 Months 2008
43 TNEB Repair and replacing of stator coils to class `F’ insulation of 15 MW, FUJI (Japan) make, Bulb generator 75 RPM – Barrage 2. 12 Months 2008
44 KSEB Repair, replace and reinsulation of Rotor coils to class `F' insulation of 3.5 MVA, 11 KV, 750 RPM, Jyoti Ltd., (India) make - Peppara Power House. 12 Months 2008
45 TNEB Repair and replacing of stator coils to class `F' insulation of 15 MW, FUJI (Japan) make, Bulb generator 75 RPM - Barrage 2. Unit II 6 Months 2008
46 TNEB Repair and replacing of stator coils to class `F' insulation of 15 MW, KONKAR (Croatia) make, Bulb generator 75 RPM - Barrage 2. Unit I 12 Months 2008
47 TNEB Manufacturing and installation of 216 Nos. new stator coils with class `F' insulation, Removing and re varnishing of 70 ton stator stampings and revarnish with conveyor oven, testing, aligning and commissioning of 60 MW, Westing House (Canada) make, 11 KV, 333.3 RPM - Unit I - Kundah Power House - 3. 60 Months 2009
 
TNEB Tamilnadu Electricity Board, India. KSEB Kerala State Electricity Board, India
SPB Seshasayee Paper And Boards Limited, India. TTPL Travancore Titanium Product Limited, India.
SPIC Southern Petrochemical Industries Corporation Limited, India. DS Dharani Sugars And Chemicals, India.
KSCL Kothari Sugars And Chemicals Limited, India. TASL Thiru Arooran Sugars Limited, India.
SIL Sterlite Industries Limited, India LSC Leroysomer And Controls India (P) Limited, India/France
TCL Thirumalai Chemicals Limited, India. JSW Jindal South West
SPML Sun Paper Mill Limited Adyard Adyard abudhabi LLC, Abudhabi.