High Voltage Generator/Motor repair/recondition
 
  List of High Voltage Alternators Repaired / Rewound / Upgraded By Us
 
Sl.No. Customer Scope of work Guarantee Executed    on
1 TNEB Repair and class `F' reinsulation of stator coils of   40 MW, Alsthom (France) make, 11 KV, 500 RPM - Kodayar Power House - 2. 12 Months 1998
2 SPB Complete reinsulation to class `H' level of rotor winding of  4 MW BBC make, 3.3 KV, 3000 RPM - Erode. 12 Months 1998
3 TTPL Complete rewinding the stator and rotor with new winding to class `F' level insulation of  1 MW, Leroy Somer (France) make, 11 KV, 1500 RPM - Trivandrum. 12 Months 1999
4 TTPL Complete rewinding the stator and rotor with new winding to class `F' level insulation of  1 MW, Kirloskar Electric (India) make, 11 KV, 1500 RPM - Trivandrum. 12 Months 2000
5 TNEB Repair and class `F' reinsulation of stator coils of   60 MW, Alsthom (France) make, 11 KV, 500 RPM  - Kodayar Power House - 1. 12 Months 2001
6 KSEB Complete reinsulation of rotor pole coils to class `H' insulation, site balancing, dismantling, assembling and commissioning of   18 MW, RADE KONCAR (Yugoslavia) make, 11 KV, 750 RPM   - Unit II - Sholayar Power House. 60 Months 2001
7 TTPL Complete rewinding the stator and rotor with new winding to class `F' level insulation of   1 MW, Leroy Somer (France) make, 11 KV, 1500 RPM  - Unit II - Sholayar Power House. 12 Months 2002
8 TNEB Repairing of stator winding of   7 MW, BTH (UK) make, 11 KV, 600 RPM  - Unit III - Papanasam Power House. 12 Months 2002
9 TNEB Repair and class `F' reinsulation of rotor pole coil of   100 MW, BHEL (India) make, 300 RPM  - Kadamparai Power House 12 Months 2002
10 TNEB Repair and replacing of stator coils to class `F' insulation of   15 MW, FUJI (Japan) make, Bulb generator 75 RPM   - Barrage 2. 12 Months 2002
11 KSEB Complete reinsulation of rotor pole coils to class `H' insulation, site balancing, dismantling, assembling and commissioning of   18 MW, RADE KONCAR (Yugoslavia) make, 11 KV, 750 RPM  - Sholayar Power House. 60 Months 2002
12 TNEB Complete reinsulation of 28 Nos. rotor pole coils to class `H' insulation, site balancing, dismantling, assembling and commissioning of   20 MW, BHEL (India) make, 11 KV, 214 RPM  - Servalar Power House. 24 Months 2002
13 TNEB Repair and reinsulating the rotor pole coil of   50 MW, 11 KV, Electro sila (Russia) make, 136.4 RPM  - Mettur Tunel Power House. 12 Months 2003
14 TNEB Repair and replacing of stator winding to class `F' insulation of   100 MW, BHEL (India) make, 300 RPM   - Kadamparai Power House - Unit 2. 12 Months 2003
15 KSEB Making the SPM machine, drilling and boring the 24 Nos. rotor pole pin and rotor spider bore, making the 24 Nos. new rotor pole locking pin with suitable dimension of   18 MW, RADE KONCAR (Yugoslavia) make, 11 KV, 750 RPM  - Unit III - Sholayar Power House. 60 Months 2003
16 KSEB Refurfishing of turbine parts, replacing of runner with new one, removing the old stampings, filling the new stampings, installing of class `F' coils, testing, erection and commissioning of uprated from   15 to 17.5 MW, 11 KV, BBC make, 750 RPM  - Unit - I - Neriyamangalam Power House. 12 Months 2003
17 TNEB Repairing the Stator coils of   60 MW, General Electrical (Canada) make, 11 KV, 333.3 RPM  - Unit III - Kundah Power House - 3. 12 Months 2004
18 KSEB Refurfishing of turbine parts, replacing of runner with new one, removing the old stampings, filling the new stampings, installing of class `F' coils, testing, erection and commissioning of uprated from   15 to 17.5 MW, 11 KV, BBC make, 750 RPM  - Unit - II - Neriyamangalam Power House. 12 Months 2002
19 KSEB Repair, replace and reinsulation of stator coils to class `F' insulation of   130 MW, 11 KV, 375 RPM, Canadian General Electric (Canada) make  - Idukki Power House. 12 Months 2004
20 TNEB Repairing, dismantling and assembling the stator and rotor of   12.5 MW metro politan vickers (UK) make, 11 KV, 250 RPM  - Unit - I - Dam Power House - Mettur. 12 Months 2005
21 KSEB Refurfishing of turbine parts, replacing of runner with new one, removing the old stampings, filling the new stampings, installing of class `F' coils, testing, erection and commissioning of uprated from   15 to 17.5 MW, 11 KV BBC make, 750 RPM  - Unit - III - Neriyamangalam Power House. 12 Months 2005
22 KSEB Repair, replace and reinsulation of stator coils to class `F' insulation of   3.5 MVA, 11 KV, 750 RPM, Jyoti Ltd., (India) make   - Peppara Power House. 12 Months 2005
23 SPIC Repair of stator winding and replacing of magnetic wedges of   6 MW, Toyotogi (Japan), 11 KV, 1500 RPM  - Tuticorin. 6 Months 2005
24 KSEB Repairing of stator winding of   55 MW, Allis Chalmers (Canada) make, 11 KV, 500 RPM   - - Unit II - Sabarigiri Power House. 12 Months 2006
25 DS Repair and reinsulation of stator winding of   15 MW, CKD (Czechoslovakia) make, 11 KV, 1500 RPM   - Polur. - 2006
26 KSCL Repair and removing the corona activities by applying suitable carona protection materials of   6 MW, Kirloskar Electric (India), 11 KV, 1500 RPM  - Trichy. 6 Months 2006
27 TASL Repair and removing the corona activities by applying suitable corona protection materials of   18 MW, GEC Alsthom (France), 11 KV, 1500 RPM  - A. Chittoor. 6 Months 2006
28 TNEB Manufacturing and installation of 216 Nos. new stator coils with class `F' insulation, Removing and revarnishing of 70 ton stator stampings and revarnish with conveyor oven, testing, aligning and commissioning of   60 MW, Westing House (Canada) make, 11 KV, 333.3 RPM  - Unit II - Kundah Power House - 3. 60 Months 2007